AbouRizk, S M and Halpin, D W (1990) Probabilistic Simulation Studies for Repetitive Construction Processes. Journal of Construction Engineering and Management, 116(04), 575–94.

Ahmad, I (1990) Decision‐Support System for Modeling Bid/No‐Bid Decision Problem. Journal of Construction Engineering and Management, 116(04), 595–608.

Al Sarraj, Z M (1990) Formal Development of Line‐of‐Balance Technique. Journal of Construction Engineering and Management, 116(04), 689–704.

Bernold, L E (1990) Testing Bar‐Code Technology in Construction Environment. Journal of Construction Engineering and Management, 116(04), 643–55.

Gerwick, B C (1990) Implementing Construction Research. Journal of Construction Engineering and Management, 116(04), 556–63.

Gibson, G E and Bell, L C (1990) Electronic Data Interchange in Construction. Journal of Construction Engineering and Management, 116(04), 727–37.

Hampton, D, Jin, J S and Clark, E A (1990) Foundation Construction within Wastewater‐Treatment Plant. Journal of Construction Engineering and Management, 116(04), 564–73.

Pultar, M (1990) Progress‐Based Construction Scheduling. Journal of Construction Engineering and Management, 116(04), 670–88.

Seydel, J and Olson, D L (1990) Bids Considering Multiple Criteria. Journal of Construction Engineering and Management, 116(04), 609–23.

Thomas, H R, Maloney, W F, Horner, R M W, Smith, G R, Handa, V K and Sanders, S R (1990) Modeling Construction Labor Productivity. Journal of Construction Engineering and Management, 116(04), 705–26.

Thomas, H R, Smith, G R and Wright, D E (1990) Resolving Disputes over Contract Notice Requirements. Journal of Construction Engineering and Management, 116(04), 738–55.

  • Type: Journal Article
  • Keywords: Contract management; Legal factors; Dispute resolution; Conflict; Claims; Contracts;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1990)116:4(738)
  • Abstract:
    This paper describes the legal aspects of contract notice requirements. It is intended as a guide for contract administrators and contractors to help determine if the requirement for written notice has been satisfied as a prerequisite for a claim for an equitable adjustment. Based on an examination of case law, four primary rules are given. Does the notice clause apply? Was the requirement satisfied? Was the owner prejudiced? Can the requirement be waived and was it? Issues under each rule are identified, and examples are given. Other related aspects are also discussed, such as the importance of contract breach, form of communication, role of schedules, requirements for additional detail, and apparent authority. Recommended practices are also given.

Vorster, M C and De La Garza, J M (1990) Consequential Equipment Costs Associated with Lack of Availability and Downtime. Journal of Construction Engineering and Management, 116(04), 656–69.

Yates, J K (1990) Data‐Base Systems for Evaluating Construction Programs. Journal of Construction Engineering and Management, 116(04), 624–42.